categories: apartments current turnkey
RSI is providing a turnkey concrete package for the new MetWest apartment building in Tampa
categories: completed university turnkey
Micro Electronics Research (MER) Cleanroom expansion for the University of Texas at Austin.
categories: apartments completed turnkey
RSI provided a turnkey concrete package from foundation through rooftop for Phase 2B of the new student housing project at the University of Miami in Coral Gables.
categories: apartments completed turnkey
RSI is providing a turnkey concrete package from foundation through rooftop for the new housing project at Newport and Fig Streets in Tampa, Reign Living Student Apartments.
categories: apartments completed turnkey
RSI provided a turnkey concrete package from foundation through rooftop for the new 101 N. Meridian building in Tampa’s Channelside District.
RSI provided a turnkey concrete package for the new Mote SEA project in Sarasota, and 110,000 square foot, $130 million facility.
RSI provided a turnkey concrete package from foundation through rooftop for Phase 1 of the new Pier 66 residential tower in Ft. Lauderdale.
RSI provided a turnkey concrete package for the new mixed-use Grove Central project in Miami. The project includes a 23-story tower and a 6-level parking garage.
RSI provided a turnkey concrete package from foundation through rooftop for the new St. Regis Longboat Key Resort and Residences. RSI will be working on the Residential portion of the project.
RSI provided a turnkey concrete package from foundation through rooftop for the new Symphony Square-Office project in Austin, Texas. The building has 8 levels of offices with 158,800 gross square footage of office space. There are 4 levels of below-grade parking with a total of 129,005 square feet of parking.
categories: apartments completed hotel turnkey
RSI provided a turnkey concrete package from foundation through rooftop for the new Ascent St. Petersburg building. The $170 million project included 32,000 cubic yards of concrete with just under 750,000 gross square feet of space.
RSI provided a turnkey concrete package from foundations through roof for the new Hyde Park House luxury condominium project in Tampa. The new building is approximately 350,000 square feet with about 16,000 cubic yards of concrete.
RSI provided a turnkey concrete package from foundations through roof for the new Marina Bay 880 project in Clearwater, two 9-story towers with an amenity deck, with over 350,000 square feet of slab on deck.
categories: apartments completed turnkey
RSI provided a turnkey concrete package from foundations through roof for the new building and parking garage. RSI’s work on the project included 20,000 cubic yards of concrete, 1650 tons of reinforcement, and 600,000 pounds of post-tension material to help create a total 500,000 square feet.
RSI provided a turnkey concrete package from foundations through roof for the new Starwood Capital Group headquarters, with a total of 136,342 square feet of office space, along with 305 parking spaces.
categories: architectural completed condos turnkey
RSI provided a turnkey concrete package from foundations through roof for Block H of the downtown Tampa Water Street project. Block H is part of Strategic Property Partners’ (SPP) $3 billion Water Street project in downtown Tampa.
categories: completed
RSI’s work included the foundation and ground work for a two-story parking garage and a four-story precast concrete system office building.
RSI provided a turnkey concrete package for the Bal Harbour Shops expansion project in Bal Harbour, including a new helix ramp for the existing parking garage, a new 6-story, 300,000 square foot parking garage to support the expanded retail space, and a new north entrance to the mall.
RSI provided a turnkey concrete package for the new Pura Vida condominium project on Clearwater Beach. The new building has 122,000 square feet of structural construction.
categories: architectural completed turnkey
RSI provided a turnkey concrete package for the final phase of the Hyde Park Village 300,000-square-foot renovation project.
categories: apartments civil completed turnkey
RSI will be providing a turnkey concrete project for the first phase of the Liberty City Rising project in Miami.
RSI provided a turnkey concrete package, including all concrete work from foundations through roof, for the new Hampton Inn/Home2 Suites at Channelside.
RSI provided a turnkey concrete package for the new Mark Sarasota condominium building, a 12-story, mixed-use development with 157 residential units; 35,000 square feet of retail space; and 11,000 square feet of office space.
RSI provided a turnkey concrete package for the Virage high-rise condominium project on Bayshore Drive Tampa, a 24-story, 70-unit tower with views of Hillsborough Bay and the downtown Tampa skyline.
categories: architectural completed university turnkey
RSI provided turnkey concrete services from foundations through the architectural concrete roof for the new Thomas P. Murphy Design Studio Building at the University of Miami School of Architecture.
categories: apartments completed turnkey
RSI provided a turnkey concrete package for the new HuB Lofts project on Second Street near Goodrich Avenue in Sarasota, near the existing HuB business incubator office building.
RSI will be providing a turnkey concrete package for the new Fairfield Inn and Suites on Clearwater Beach. The new hotel will be a 6-story building with a 102 rooms and a total area of 113,323 square feet.
categories: architectural completed turnkey
RSI provided a turnkey concrete package for the Paradise Plaza project, including all foundation work through top-out.
The project included an underground parking garage with a hydrostatic slab and cast-in-place walls for the entire perimeter of the garage.
RSI provided a turnkey concrete package, including Class A finish exposed concrete, for the new 43,200 square-foot Surfstyle parking garage and retail space at 1155 Collins Avenue, just 1 block west of Miami Beach in the heart of South Beach.
RSI provided cast-in-place concrete services for the new Salvador condominium project in downtown St. Petersburg, including the foundations, vertical work, and two post-tensioned structural decks totaling just under 50,000 square feet.
RSI is providing turn-key concrete services for the new Bliss condominium building in St Petersburg, including the 5-story parking garage and the 13-story post-tensioned residential portion of the structure.
RSI provided all the concrete work for the 10-story post-tensioned structural deck system for the hotel and adjacent parking garage. The finished hotel is just under 400,000 total square feet, with about 350,000 structural, post-tensioned decks.
RSI will provide all the concrete work for the 6-story post-tensioned structural deck system for the new Edgewater Beach Resort on Treasure Island.
The overall building size will be approximately 180,000 square feet, with about 150,000 square feet of structural, post-tensioned desks.
categories: completed condos pre-construction turnkey
RSI has been awarded a contract for the Infinity Condominium on Longboat Key and will be providing turn-key concrete work for all the building concrete. The 5-story post-tensioned concrete structure will contain 11 luxury beachfront condominiums.
categories: completed pre-construction turnkey
Turnkey concrete package for the new headquarters for GLF Construction, including extensive architectural concrete finishes throughout
categories: civil completed pre-construction
RSI will be providing the commercial concrete work for the renovations of the Brickell City Centre 8th Street Metromover Station in Miami.
categories: apartments pre-construction turnkey
Turnkey concrete package for Next Level, two new student apartment buildings in Gainesville, FL. The commercial concrete work includes foundations, columns, beams, an extensive amount of cast-in-place walls and 15” structural “podium” decks. The project has aggressive schedule demands: RSI has 16 weeks to complete both structural decks.
RSI is providing a turnkey concrete package for the new 48,000 square foot academic building at St. Leo University in St. Leo, FL. The commercial concrete work for the structural steel building includes foundations, shear walls, and concrete on metal decks and will be complete by year’s end.
The new $14 million building replaces the 8,000-square-foot Crawford Hall and will be finished for the start of fall semester 2015.
The four-story building will include 16 classrooms and 24 faculty offices and will incorporate eco friendly design features. The exterior Spanish Mission style of the new structure will complement surrounding buildings and will be visible immediately when entering the campus.
The architect is Gould Evans of Tampa, FL, and the general contractor is Creative Contractors, Inc., of Clearwater, FL. RSI is working closely with them to ensure on-time and within-budget completion of the new building.
categories: completed
RSI was recently awarded the foundation concrete work for the H. Lee Moffitt Cancer Center’s new 200,000 square-foot, $74.2 million outpatient facility.
categories: completed
RSI will provide 260,000 square feet of post-tensioned deck for the 139-room hotel and 141-unit luxury apartment complex.
categories: completed
The Finale at Sand Key in Clearwater on Sand Key Beach is a new seven story 23 unit condominium complex. RSI recently finished pouring the concrete for the commercial project, completing the concrete structures on the property according to the specs provided by the architect. We created a 7-story cast-in-place structure with post-tensioned decks using 5000 pounds-per-square-inch concrete and provided all materials, equipment, and labor to build the job.
categories: completed
The Airside ‘F’ terminal of Tampa International Airport was being expanded with an additional 30,000 square feet and includes the renovation of 40,000 square feet of existing space.
RSI provided the concrete work for the interior renovation work as well as the signature canopy structure.
categories: apartments completed pre-construction turnkey
Westminster Shores is an adult living facility located just steps from the shores of Tampa Bay, in St. Petersburg’s Bahama Shores neighborhood. This five-story building is the newest addition to the 26-acre campus.
RSI provided full-service, high-quality turnkey concrete work for the Westminster Shores project, from pile caps and grade beams through the post-tensioned roof slab. The building consists of almost 90,000 square feet of space and includes approximately 70,000 square feet of post-tensioned deck. RSI topped-out the concrete structure by pouring the roof slabs and completed the project with concrete cast-in-place stairs and the slab-on-grade.
categories: completed hotel pre-construction
The new Epicurean Hotel has 137 guest rooms and features a restaurant and wine bar, a retail wine shop, a bakery, full service spa, health club, swimming pool with cabanas, a second floor open-air special events area, rooftop lounge, and flexible function space.
The hotel, located directly across the street from the iconic Bern’s Steak House, also features a demonstration kitchen, home to the Bern Laxer School of Food and Wine.
Our work comprised all the commercial concrete work for the new hotel, including 110,000 square feet of post-tensioned deck. On this project, RSI was responsible for the design and engineering of the post-tensioned decks. With great teamwork from the client and their design and engineering firms, RSI was able to provide a low-cost and structurally sound system that perfectly met the needs of the client and owner.
categories: completed hotel pre-construction turnkey
In four months, RSI provided cast-in-place post-tensioned concrete for 112,000 square feet in the seven story building.
categories: completed university turnkey
Five-story precast joist and soffit beam structure totaling 75,000 sf. RSI completed the project in five months.
This is a six-story, 120,000 square-foot assisted living facility & one-story cast-in-place parking garage.
RSI was responsible for the pile caps, columns, shear walls & decks. Columns mounted form tables were utilized for 8” thick decks. The use of this system allowed the masonry to follow 2 stories behind the decks, therefore helping the contractor meet their tight schedule.
categories: completed
RSI provided the commercial concrete for a 60,000 square foot laboratory building with reinforced columns, walls, decks, beams & slab-on-grade. The floors were 14 inches thick & contained 385 tons of reinforcing steel.
categories: completed hotel pre-construction turnkey
RSI completed the concrete for the ten-story post-tensioned structure, including 4 stories of parking, totaling 120,000 sf. This project was completed in five months.
Burby Engineering - Pier 60 House Hotel
categories: architectural completed museum turnkey
The new museum’s exterior includes polished and bush-hammered concrete walls and a trellis system, and the interior includes galleries with exposed architectural concrete walls and columns. Throughout the museum, the design called for wide-open spaces, minimizing the need for columns or other supports, and RSI accomplished this using a Cobiax structural system.
As highlighted in the video below, taken by Museum Director Thom Collins, the pouring of the concrete was especially important in this project because seamless architectural concrete lines were integral to Herzog & De Meuron’s architectural design.
“RSI built the most complicated concrete frame I’ve ever seen. Not only was it complicated structurally but it had to look great. RSI delivered a fantastic result. We are glad they were on our team.”- John Leete president of John Moriarty of Florida.
Museum Director Thom Collins provides a behind the scenes look at the construction of the Miami Art Museum.
YouTube - Museum Construction
Learn all about the construction of the Miami Art Museum
“RSI built the most complicated concrete frame I've ever seen. Not only was it complicated structurally but it had to look great. RSI delivered a fantastic result. We are glad they were on our team.”- John Leete President of John Moriarty of Florida
categories: architectural completed museum pre-construction turnkey
RSI was selected for the structural concrete of the $30 million, 66,400-square-foot Salvador Dai Museum in St. Petersburg. The building features a one-way cast-in-place concrete slab and beam system for the base structural system. Internationally acclaimed architect Yann Weymouth, with HOK’s Tampa office, designed the museum. There were many challenges to be met with this structure: The building had to sustain hurricane winds, and it was built on a plot of land that was only 5 inches above sea level. The architect had specific ideas about eliminating surface lines in the structure. To accommodate these challenges, RSI worked very closely with the design team to ensure their vision.
Here is an article on the project at gostructual.com:
Protecting Dali’s Art »
Project images at www.hok.com:
Dali Museum images
“"...we were worried about using architectural concrete for the design of the new Dali Museum. RSI did an extraordinary job and we couldn't be more pleased with the outcome. We are all very proud of the way the museum turned out, thanks in large part to RSI"”- Yann Weymouth AIA Director of design Florida HOK